The cold weather continued through the weekend. We had an unexpected four-day weekend. The cold weather and snow makes it difficult to find energy to get moving in the mornings – perfect weather for sleeping in late and curling up on the couch with a book. A plan that Isabella agrees with.
Despite the weather and general lack of motivation, we were able to make progress on the bathroom addition. I was able to get some of the wiring done – the rest requires a climb into the attic, something that I had no desire to do with the temperatures in the teens this weekend. However, I was able to run some new plumbing in the basement and pull out the old copper piping – something that I had been meaning to do for several years. The acidic well water slowly eats away at the copper piping and has caused small leaks over time.
We also completed more of the demolition and I tore up part of the subfloor. I’ll have to replace the subfloor in the corner that we will turn into a bathroom so we can tile the bathroom floor. The next step is to finish pulling out the nails that held up the lath (Susanna has been working on that) and finish the wiring (when I can work in the attic without freezing my fingers off) so that I can get the walls insulated (I’m planning on spray foam insulation). I’ll also need to order new subflooring and tear out the remainder of the hardwood flooring and section of subfloor so I can get started on framing and plumbing.