We picked up our second batch of birds today from the Norwich Agway. This was their first delivery of the season, and the line at opening went out the back door. We picked up 10 more birds, 6 chickens and 4 ducks. The chickens are 2 Easter Eggers, 2 Buttercups, and 2 Speckled Sussex. I’m hoping that we get no more than 1 rooster out of the 12 chickens we picked up this year, but there is only a 90% accuracy on the chickens. The ducks are a straight run, so it should be a mix of males/females. We picked up 2 White Pekins and 2 Khaki Campbells. I think the brooder is full enough for now. We may pick up more on the last run of chicks/ducks at the end of April if we can move the current birds into the coop by then – maybe grab some Blue Swedish ducks.
Category: Family
Backyard Picnic
Today the thermometer pushed into the mid-60’s and Izzy and I were able to enjoy our lunch out on the patio. It finally feels like spring. However that won’t last. The forecast for next week includes snow.
Tomorrow the plan is to get up early and get the next batch of birds; this will likely be one of the few times Izzy won’t fuss about getting dressed in the morning.
Chicken Season
We picked up our first batch of chicks today from Fleming’s Feed in Preston. We got a total of 6 today, 3 Buff Orpingtons and 3 RI reds. Saturday morning we get the next batch from the Norwich Agway, 6 more chicks and 4 ducks (maybe). The brooder was made from left over lumber and painted. The stencils were cut out on the laser for the decoration. Instead of a heat lamp, I picked up a Brinsea Ecoglow Safety Brooder to keep them warm. After a friend lost his garage to a fire caused by a heat lamp, I decided it is not worth the risk to use one.
Attempting to repair an GE Adora Series Dishwasher
Or, why one may not want to buy a GE dishwasher.
Last week, Susanna noticed the dishwasher was making a whining noise when it was running, and it wasn’t cleaning the dishes properly. I did a little online searching, and it seemed the likely culprit was the pump motor.
This morning, I noticed water raining down in the basement when the dishwasher was running. Not a good sign. After the cycle finished I pulled out the dishwasher and looked underneath. The water was coming from a rubber hose between the dishwasher pump and the main diverter valve assembly. The part is available online for around $60, but the reviews said the replacement part had many failures in the same manner that the original did, lasting less than 2 years in most cases. One reviewer mentioned patching the leaking hose and I took that path.
Ben and I drove to the local Home Depot and I got some Flex Seal paste for the inside of the hose, some E-Z Fuse Silicone Tape to wrap around the outside, and new hose clamps. Hopefully that will repair the leak.
The leak is on the outlet (high-pressure) side of the pump, and seems to be a design flaw. If the repair doesn’t hold, I’ll order the new part, and add a few wraps of the silicone tape to the outside to hopefully extend the life of the new part.
Next step is to wait the 24-hour cure time of the Flex Seal and see if that fixes the problem (for now).
And a New Year
We started the year with a short hike at Poquetanuck Cove Preserve, just around the corner from our house. It was cold, but nice to get out of the house.
Thanksgiving 2020
After a crazy year, we were finally able to see family over Thanksgiving. My dad had and recovered from COVID this fall, so was able to travel over Thanksgiving without having to quarantine. We were able to get out and do some hiking, worked on the kitchen, and even replaced the bumper on the truck from the accident Will had the week before Thanksgiving.
Halloween Pictures
I’ve been a little behind on posting to the website. Here are pictures from a photo shoot with the family last month. I had a little fun with Photoshop – something I don’t often play around with.
Slow progress on the Kitchen
We pushed hard throughout the summer to get the kitchen back to functional. With Susanna not working, the boys stuck at home, and no family vacation, we were able to move back into the kitchen a few months. Once we were back into the kitchen, things slowed down a lot.
In September, the kids went back to school, Izzy started school, and Susanna started work. And things slowed down. That isn’t to say, I got nothing done. I have installed most of the trim, cabinet toe kick trim.
I have a few things left to finish at this point. We are tiling the backsplash ourselves. This last weekend, I tiled the nook behind the stove (seen open in the picture above). Susanna and I plan on tiling the wall this Saturday.
After we tile the wall, I need to finish the trim around the windows. It has been nearly impossible to remove the window sill trim without breaking it. I’ll need to make new sills and finish trimming the window. The window sills aren’t difficult to make, I just need to take some time in the shop and just build them. I even have an old one pulled out to duplicate.
And then it is just finishing touches. I need to order and install the baseboard trim. Again, and easy project – it just requires measuring the walls.
The final project that needs to be done is to build a radiator cover. But that wall isn’t part of the functional kitchen, so the windows and radiator are last on my list…
I’ll try to get some better pictures tomorrow.
Kitchen Update
Our plans had been to have a family trip to Europe this summer and renovate the kitchen in 2021. When the craziness of the spring spilled into the summer, we cancelled our tickets to Europe and decided to instead renovate the kitchen.
Susanna and the boys started the demolition in the beginning of July, and then I spent a few weeks updating services and hanging the drywall (with some help from Ben). The boys were stuck at home for the better part of the summer, so we had lots of help during the hard part of the project.
Earlier this month, Susanna spent two weeks finishing the ceiling and walls, from the joint compound, through sanding and finally painting. Then, last weekend, we rented a sander and spent 8+ hours sanding the one hidden gem we found during renovation – a hardwood floor under the linoleum kitchen floor.
The kitchen layout is similar to the old layout, however we did eliminate a window to give us more cabinet space, and moved the fridge. Eventually we will pick up a counter depth fridge to fit with the cabinets. We purchased cabinets from IKEA, and while I don’t really like their furniture, their kitchen cabinets are pretty easy to install and seem to be of reasonable quality. The rail system for hanging the uppers makes lining them up a snap. So no complaints there.
This weekend we hung the cabinets on the wall where the fridge will go. The next week or two will be doing the other two walls and working on trim and other finishing touches. We aren’t too far from having a partially usable kitchen!
Workshop Updates – Quarantine
I have had a lot of extra time over the last two months. I have been able to go into work part-time, and have to work from home the rest of the time. For a few weeks I was only able to go into the office for 10-15 hours a week, but am back to 5.5 hours/day in the office and 2.5 hours at home. I set up my telework workspace in my workshop – that allows me to get out of the house and work without too many distractions (at least not limits the 4-year old distractions).
As part of preparing my workspace, I removed my old, small desk from the workshop, and built in a new larger space. That gives me room for two computers (work and personal) without having one on top of the other.
In addition to my desk area, I have been spending a lot of time cleaning and organizing the workshop. I have been spending evenings over the past few weeks cleaning out the closet. I moved my personal computer into the closet, which will hopefully keep the dust down on it. I built a shelf and am in the process of building storage drawers.
The closet is heated, so I can keep paint/glue in it over the winter. I’m trying to keep the resins and glue a little better organized so I can be ready when it is warm enough outside to work on the boat.
Once I finish cleaning up the rest of the space, I’ll add pictures of the (hopefully) organized workshop.